English
Español
Português
русский
Français
日本語
Deutsch
tiếng Việt
Italiano
Nederlands
ภาษาไทย
Polski
한국어
Svenska
magyar
Malay
বাংলা ভাষার
Dansk
Suomi
हिन्दी
Pilipino
Türkçe
Gaeilge
العربية
Indonesia
Norsk
تمل
český
ελληνικά
український
Javanese
فارسی
தமிழ்
తెలుగు
नेपाली
Burmese
български
ລາວ
Latine
Қазақша
Euskal
Azərbaycan
Slovenský jazyk
Македонски
Lietuvos
Eesti Keel
Română
Slovenski
मराठी
Srpski језик EPIC, a leading Chinese supplier, presents the Desorption Electrolytic System, designed for high-efficiency, environmentally friendly gold recovery. This system integrates advanced chemical processes with precise automation, allowing modern gold processing plants to achieve rapid, high-purity gold extraction with minimal energy and reagent use.
The system is engineered to provide top performance in high-pressure, high-temperature desorption, ensuring that gold-loaded activated carbon is processed quickly and efficiently. The technology eliminates the need for cyanide in the desorption solution, reducing environmental impact and operational costs while improving safety for operators.
1. When gold-loaded carbon reaches 3000 g/t, the desorption rate exceeds 96%.
2. Traditional desorption cycles of 24–48 hours are reduced to 8–12 hours, tripling plant throughput.
3. High-temperature operation up to 150℃ and system pressure up to 0.5 MPa accelerates gold desorption.
1. No cyanide required in desorption solution.
2. Reduced total energy consumption: 1/2–1/4 compared to conventional systems due to faster cycles.
3. Reusable reagents and minimal chemical waste ensure compliance with modern green mining standards.
1. The electrolytic process of Desorption Electrolytic System produces gold mud with high purity, reducing post-extraction refining.
2. One-step extraction avoids reverse electrolysis, simplifying operations.
1. Includes temperature, liquid level, and process automation systems for one-button operation.
2. Full safety measures: intelligent system monitoring, automatic pressure release, and insurance safety valve.
3. Minimizes human error, maximizes operational safety and consistency.
1. Integrated desorption, electrolysis, and activated carbon regeneration in a modular, skid-mounted system.
2. Full enclosure reduces metal loss and environmental exposure.
|
Parameter |
Value / Range |
|
Max Desorption Temperature |
150℃ |
|
Max System Pressure |
0.5 MPa |
|
Desorption Cycle Time |
8–12 hours |
|
Gold Recovery Rate |
≥96% |
|
Activated Carbon Input Grade |
Up to 3000 g/t |
|
Energy Consumption |
1/2–1/4 of conventional system |
|
System Control |
Automated (Temperature + Liquid Level + Process) |
|
Safety Protection |
Triple protection: intelligent system, pressure release, insurance valve |
|
Cyanide Use |
Not required |
1. Gold-Loaded Carbon Input – Activated carbon containing gold is fed into the desorption tank.
2. High-Temperature, High-Pressure Desorption – Rapid gold release without cyanide addition.
3. Electrolytic Gold Recovery – Gold in the desorption solution is converted into solid gold mud.
4. Carbon Regeneration – Activated carbon of Desorption Electrolytic System is regenerated and ready for the next adsorption cycle.
5. Automated Monitoring – Liquid level, temperature, and pressure are continuously monitored for safe, efficient operation.
|
Feature |
EPIC Desorption Electrolytic System |
Conventional Desorption Electrolytic System |
|
Desorption Time |
8–12 hours |
24–48 hours |
|
Gold Recovery Rate |
≥96% |
70–85% |
|
Energy Consumption |
1/2–1/4 |
High |
|
Cyanide Usage |
None |
Required |
|
Safety Measures |
Triple Protection + Automation |
Manual supervision |
|
Carbon Reuse Efficiency |
High |
Moderate |
· Gold mines with high production volumes needing fast processing cycles.
· Plants seeking eco-friendly and cyanide-free gold recovery solutions.
· Modern operations requiring automation, high recovery rates, and reduced labor.
· Integration into full mineral processing lines for one-stop gold recovery solutions.
· Increased plant throughput and faster gold recovery.
· High-purity gold output, reducing post-processing requirements.
· Lower operational costs and environmental compliance.
· Reduced human intervention with automatic control and safety systems.
The Electrolytic System is a result of advanced engineering, top-tier processing equipment, and continuous innovation in gold recovery technology. With ISO9001:2015 certification, patents, and a proven export record to Russia, Kazakhstan, Chile, and other countries, EPIC ensures reliable performance, rapid delivery, and professional after-sale service.
The EPIC Desorption Electrolytic System combines chemical efficiency, high recovery, automated control, and eco-friendly design. It delivers a precise, fast, and cost-effective gold extraction process suitable for modern gold processing plants worldwide. By integrating desorption, electrolysis, and activated carbon regeneration in one system, EPIC ensures maximum output and operational safety while reducing costs and environmental impact.